An 8m long tube with the entrance about 2m above the ground, directly above site 242. The boulder-blocked passage continues.
Reference: anon., 1997b (logbook)
Entrance picture :
Underground picture(s):
Detailed Survey :
Line Survey :
On area survey :
Survex file :