Site 4474: Pics from autumn 2017 - digging at the end of the large passage by
Nigel Easton (A1) and Phil Parker (A2-D1).
A1: Looking back from the large passage terminal point at Phil Parker.
A2: Nigel Easton working in the opened-up draughting terminal point.
A3-5: Large passage formations.
B1: Alf Latham working at the start of the draughting, sand-filled bedding plane.
B2-4: Formations in the dug sandy bedding plane.
B5:
Draughting shaft & small passage continuation beyond the sandy bedding plane.
C1:
Close-up of passage continuation. C2,3: Nigel Easton in passage before shaft.
C4,5: Formations before shaft. D1: Nigel Easton and formations at end of big passage. |