Digital photos from site 2813 by Juan Corrin (A1-C3)
Easter 2008
with Steve Martin, eg F3; Andy Pringle, eg D4, Phil Papard, eg F2 and
Juan Corrin, eg A5.
Day 1: A1-B1 entrance rifts; A3 is low crawl at base of rift to dig.
Day 2: Excavate to head of pitch, F3-F5.
Day 3: B2-B4 low crawl at N of chamber; B5-C5, D5-F2 main chamber;
D1,D2, D4 bulbuous formations to east of main chamber; D3 Crawl on
south side of chamber. |