30/7/26 - looking up the entrance ladder (Mike Wise)
30/7/26 - looking down to the pit floor (Mike Wise)
30/7/26 - after 30 minutes clearing out stored rocks and some spoil from the down dip area (Mike Wise)
30/7/26 - after another 45 minutes of digging and clearing back to the pit (Mike Wise)
31/7/26 - Guy and Miriam (Mike Wise)
31/7/26 - the dig end after the session (Mike Wise)
2/8/26 - the approach to the bedding roof at session end (Mike Wise)
3/8/26 - the rigid ladder installed in its storage position (Mike Wise)
4/8/26 - Guy digging in the Pit wih the rigid ladder in its working position (Mike Wise)
4/8/26 - Mike taking a turn digging down. Behind is a right hand bend hiding dry formations and a draughting slot down. (Mike Wise)
6/8/26 - The dry formations (Mike Wise)
6/8/26 - Miriam happy about getting the big rock out (Mike Wise)
6/8/26 - Calcite and small stal layered on the big rock (Mike Wise)
6/8/26 - Vignesh in the dig (Mike Wise)
6/8/26 - dig near side at session end (Mike Wise)
6/8/26 - dig far side at session end below the bedding roof looking down with draught coming up and out (Mike Wise)
7/8/26 - The end, right hand draughting hole (Mike Wise)
7/8/26 - The end, left hand draughting hole (Mike Wise)
10/8/26 - the approach to the rift pot showing the end of the capped off bedding (Mike Wise)
10/8/26 - the top of the rift pot (Mike Wise)
11/8/26 - Ollie preparing to make the first descent into the rift pot (Mike Wise)
11/8/26 - Cramped conditions in the approach to the top of the rift pot (Mike Wise)
11/8/26 - Meghan ready to start modifications to the top of the rift pot. (Erin Doyle)
11/8/26 - Modifications completed. (Meghan Hughes)
11/8/26 - Mike in the bottom of the rift pot talking to Erin during filming after starting to cap the way on. (Meghan Hughes)
30/7/26 - looking up the entrance ladder
30/7/26 - looking down to the pit floor
30/7/26 - after 30 minutes clearing out stored rocks and some spoil from the down dip area
30/7/26 - after another 45 minutes of digging and clearing back to the pit
31/7/26 - Guy and Miriam
31/7/26 - the dig end after the session
2/8/26 - the approach to the bedding roof at session end
3/8/26 - the rigid ladder installed in its storage position
4/8/26 - Guy digging in the Pit wih the rigid ladder in its working position
4/8/26 - Mike taking a turn digging down. Behind is a right hand bend hiding dry formations and a draughting slot down.
6/8/26 - The dry formations
6/8/26 - Miriam happy about getting the big rock out
6/8/26 - Calcite and small stal layered on the big rock
6/8/26 - Vignesh in the dig
6/8/26 - dig near side at session end
6/8/26 - dig far side at session end below the bedding roof looking down with draught coming up and out
7/8/26 - The end, right hand draughting hole
7/8/26 - The end, left hand draughting hole
10/8/26 - the approach to the rift pot showing the end of the capped off bedding
10/8/26 - the top of the rift pot
11/8/26 - Ollie preparing to make the first descent into the rift pot
11/8/26 - Cramped conditions in the approach to the top of the rift pot
11/8/26 - Meghan ready to start modifications to the top of the rift pot. Photo credit Erin Doyle
11/8/26 - Modifications completed. Photo credit Meghan Hughes
11/8/26 - Mike in the bottom of the rift pot talking to Erin during filming after starting to cap the way on. Photo credit Meghan Hughes