Digital photos from some of the 15 days activities at the SubPhone Dig (now Entrance) (site 4536) by
Juan Corrin (JC), Phil Papard (PP), Torben Redder (TR), Penny Corrin (PC)
|
|
1 |
2 |
3 |
4 |
5 |
23rd July |
|
François Tollemer in the hole at the start of the summer
digging season. (JC) |
25th July |
|
|
|
|
|
1: Torben Redder. (JC) 2: JC hauling with Louise Koorsgaard, Karen & Marie. (TR)
3: PP. (TR) 4, 5: JC with PP. (TR) |
26th July |
|
|
|
|
1: Too tight at base. 2: TR. 3: Hilary Papard with TR. 4: Louise Korsgaard at top. (Photos: PP) |
28th July |
|
|
1, 2: Now deep and awkward enough for a ladder. (JC) |
30th July |
|
|
|
|
|
|
1: TR works to enlarge the narrow connection. (JC)
2: Pete Smith with Richard Bullock. 3: JC. 4: PS with JC. 5: RB with TR.
1 (lower) : RB, PS, JC. (Photos from 2, PP)
|
31st July |
|
|
1: Pete O'Neill. 2: TR (PP) |
1st
August |
|
|
|
|
|
1,2: Karen with LK. 3: Marie with PO'N. 4: Marie with LK. (Photos: TR) |
18th
August |
|
|
|
|
1-3: Checking hole
dimensions (JC) for
4: the tube (PC) |
20th
August |
|
|
1, 2 : Delivering a 3.5m section of the tube to the hole.
PP with the tube.
(JC) |
21st
August |
|
|
|
|
|
1,2,3: PP trimming the hole and cutting the tube. 4: The tube in place.
5: Trimming the route down to the verticla squeeze.
(Photos: JC) |
23rd
August
|
|
Tube excess trimmed. Backfilled with rocks and polyurethane foam. (JC) |
25th
August |
|
PP accepting concrete to surround the shaft lining. Tube lidded. (PC) |
29th
August
|
|
|
|
|
|
1: PP cutting holds in the side. 2,3,4: Completed.
(Photos: JC) |
7th
September |
|
Entrance viewed from the road after vegetation flailing. (PP) |