Clearing old scaffolding (360° photo. Right-click to download. See
help file)
(Juan Corrin)
Base of the shaft with fixed ladder and foam. Right-click to download. See
help file)
(Juan Corrin)
Entrance tube at top of depression waiting for the slide down. (Juan Corrin)
Phil with the entrance tube. (Juan Corrin)
The team removing old scaffolding. (Juan Corrin)
The state of the shoring before renovation. (Juan Corrin)
The shaft completely cleared. (Juan Corrin)
Nigel removing the top of the entrance tube. (Juan Corrin)
Giant Panda poo. (Juan Corrin)
Removing protruding rocks. (Juan Corrin)
The entrance tube installed. (Juan Corrin)
Work started to make a small retaining wall. (Juan Corrin)
View down the tube with fixed ladder. (Juan Corrin)
Work started to make a small retaining wall. (Juan Corrin)
Entrance tube OK, but the head of the pitch is still unsafe. (Juan Corrin)
Clearing old scaffolding (360° photo. Right-click to download. See help file)
Base of the shaft with fixed ladder and foam. Right-click to download. See help file)
Entrance tube at top of depression waiting for the slide down.
Phil with the entrance tube.
The team removing old scaffolding.
The state of the shoring before renovation.
The shaft completely cleared.
Nigel removing the top of the entrance tube.
Giant Panda poo.
Removing protruding rocks.
The entrance tube installed.
Work started to make a small retaining wall.
View down the tube with fixed ladder.
Work started to make a small retaining wall.
Entrance tube OK, but the head of the pitch is still unsafe.