A hole covered with limestone slabs. A slab can be removed and the entrance has been enlarged. A 2m drop leads onto 2m of boulder floor followed by 8m of zig zag passage ending at a 2m climb down into a 7m x 5m by 3m high chamber with a bouldery floor sloping at between 20 and 30 degrees. There is no way on although a gentle draught could be detected in the chamber. [Site 17b; Phil Parker]
References: anon., 2019c (Whit logbook)
Entrance pictures :
Underground picture :
Video :
Detailed survey :
Line Survey :
On area survey :
Survex file :