Updated 13th July 2017
A 2m deep hole to an earth floor. A slab needs removing.
References: anon., 2017b (Easter logbook)
Entrance pictures : Easter 2017
Underground pictures :
Video :
Detailed survey :
Line Survey :
On area survey :
Survex file :