Updated 13th October 2025
A small shaft above the track. From the 3x1m shaft top rocks fall about 8m and bounce further – sounds to be a reasonable size. As with site 4502, it seems odd it was not previously recorded – may have been put in wrong place?
It was descended in August 2025.
"Shaft was bolted by rigging off a tree as backup then rigging a Y-hang. Shaft was about 10m deep as previously recorded and choked at the bottom."
References: anon., 2017a (January, February logbook); anon., 2025b (summer logbook)
Entrance pictures : February 2017
Underground pictures :
Video :
Detailed survey :
Line Survey :
On area survey :
Survex file :