Updated 12th February 2016; 24th September 2018; 17th November 2022
The information below has been roughly translated from the French, Spéléo-Club Dijon reference, Simonnot G, 2016.
In the rocky ledge, right on the track. A crack (draught coming out in summer) served as a dump and a number of boxes of rubbish have been taken to the dustbins in Arredondo. The site has been worked at over 2012 - 2013 and a narrow fissure is visible for 4 to 5 m. Work during 2016 was hampered by blocks and bottles.
The new grid reference from Simonnot G, 2022 is used above.
Reference: anon., 2015d (autumn logbook); Simonnot G, 2016; Simonnot G, 2018; Simonnot G, 2022
Entrance picture : yes
Underground pictures :
Video :
Detailed survey :
Line Survey :
On area survey :
Survex file :