Updated 6th May 2016
A draughting dig at the south side of a shakehole. Work was carried out in April 2016 when large quantities of rock were removed from a narrow rift to give easy access. The draught is coming from small gaps between blocks. The site now has a paved area below the entrance.
Reference: anon., 2012e (autumn logbook); anon., 2016b (Easter logbook)
Entrance pictures : yes
Underground picture :
Video : Easter 2016 (YouTube)
Detailed Survey :
Line Survey :
On area survey :
Survex file :