Updated 5th January 2018
An excavated hole that drops 5m in a sloping passage. Draught seems to be coming from a 15x10cm hole at low level, but boulder stabilisation is required before any more digging can be carried out.
References: anon., 2009c (summer logbook)
Entrance pictures: 2009
Underground pictures : 2009
Video :
Detailed Survey :
Line Survey :
On area survey :
Survex file :