Updated 7th November 2009
An easy draughting dig in a rift half-filled with mud. In the summer 2009 (when there was no draught) this was partially excavated to where the roof could be seen to lower. Lots of work required.
Reference: anon., 2009a (Easter logbook); anon., 2009c (summer logbook)
Entrance pictures: yes
Underground pictures :
Video :
Detailed Survey :
Line Survey :
On area survey :
Survex file :