Updated 27th September 2012; 6th January, 24th September 2018; 21st May 2023
A good draught emerges from between blocks in a large depression. The site
has been partially excavated and there is a lot left to remove. Some boulder capping has occurred at the lowest point with the main draught coming out of the pile under the entry point. A way through to a draughting rift has been engineered. The site has been left to stabilise after a roof collapse.
In the summer 2018, the site was located. The draught was very cold snf the boulders were worth more attention.
There were a couple of visits to this site in April 2023 but there is no account of the work done.
Reference: anon., 2008e (summer logbook); anon., 2012d (summer logbook); anon., 2018c (summer logbook); anon., 2023b (Easter logbook)
Entrance pictures: August 2008 : August 2012
Underground pictures : August 2012
Video : The Steaming Man (YouTube)
Detailed Survey :
Line Survey :
On area survey :
Survex file :