A 4m deep shaft that needs opening up at the top. It appears to widen about 0.5m down.
Reference: anon., 2006d (summer logbook)
Entrance pictures :
Underground pictures :
Video :
Detailed Survey :
Line Survey :
On area survey :
Survex file :