Updated 1st February 2006; 4th November 2009
A draughting dig in the base of a shakehole. The site was dug for an hour but stronger measures are required.
Reference: anon., 2003c (summer logbook); Corrin Juan, 2005; anon., 2009c (summer logbook)
Entrance pictures: three photos
Underground picture(s):
Video:
Line survey:
On area survey:
Survex file: