A 5m diameter open hole between two pylons just above the road. A climb down of 2m onto rubbish leads to another 3m climb down with no apparent way on.
Reference: anon., 2003a (February logbook)
Entrance pictures: yes video along line of entrance
Underground picture(s):
Detailed survey:
Line survey:
On area survey:
Survex file: