A 2.5m pitch lands on a steep slope down to a squeeze then walking passage for 4m to a pool with no exit.
Reference: anon., 2002b (summer logbook); Corrin Juan, 2003b
Entrance picture: yes
Underground picture(s):
Detailed survey:
Line survey:
On area survey:
Survex file: