Updated 2nd November 2002
A 3m climb down lands on rubble. The site draughts in. A dig led to 2 small
chambers with a parallel 3m shaft.
Reference: anon., 1999c (logbook); anon., 2002b (summer logbook); Corrin Juan, 2003b
Entrance picture:
Underground picture(s):
Detailed survey:
Line survey: on 258 Torcón de la Calleja Rebollo (Toad in the Hole) area line surveys
On area survey:
Survex file: