Updated 3rd June 2000
A 6m shaft leads to a rift and adjacent daylight rift. The site ends in a
floor of jammed boulders with no draught.
Reference: anon., 1999c (logbook)
Entrance picture: yes
Underground picture(s):
Detailed survey:
Line survey:
On area survey:
Survex file: