Updated 5th, 14th May 2019
A 8m pitch had further drop which needed digging out. The entrance was refound in December 2018 as a "slot in floor at base of boulder" and photos were taken.
The dig at the base of the p8 was excavated at Easter 2019 to a descending crawl to a p2 and no obvious ways on.
Reference: anon., 1997b (logbook); anon., anon., 2018e (Christmas logbook); anon., 2019b (Easter logbook)
Entrance pictures : December 2018, April 2019
Underground pictures: April 2019
Detailed Survey : pdf, April 2019
Line Survey :
On area survey :
Survex file : April 2019