Updated 18th October 2016
Up through the jungle to the right after site 1181,
Malbujero. A small hole (formed by a surface gulley breaching the passage) enters the side of a passage with 10m of hands
and knees crawling in each direction, parallel to the hillside. Both ends
choke.
A visit in August 2016 sensed no draught and decided that each end of the passage did not warrant a dig, although it was recognised that the site is a level of development higher than the Orillón complex. (It appears to be at a similar altitude to the entrance in Coverón, to the south.)
Reference: anon., 1996c (Christmas logbook); anon., 2016c (summer logbook)
Entrance pictures : August 2016
Underground pictures: August 2016
Detailed Survey :
Line Survey :
On area survey :
Survex file :