A 4m square shaft on the side of a gully. A 30m descent, with boulders at the top, leads to a small, draughting tube which requires a lump hammer to continue.
Reference: anon., 1995c (logbook); anon., 1996b (logbook)
Entrance picture :
Underground picture(s):
Detailed Survey :
Line Survey :
On area survey :
Survex file :