Updated 14th September 2019; 16th May 2023; 1st May 2024
A draughting slot in limestone. Tagged 874.
The site was visited again in August 2019 when work started to open up the draughting slot. (Photos?)
An "endoscope" was used in April 2023 and 2024 that showed a very tight rift 2m down. The site was worked at on a couple of occasions at Easter 2024. The rift was left with very little draught and blocked with rubble.
Reference: anon., 1991 (logbook); anon., 2019d (summer logbook); anon., 2023b (Easter logbook); anon., 2024b (Easter logbook)
Entrance picture :
Underground picture(s):
Video: Easter 2024
Detailed Survey :
Line Survey :
On area survey :
Survex file :