Updated 3rd June 2000; 21st January 2001; 5th September, 14th November 2021; 4th May, 9th September 2022
A good, draughting underground dig in a wet weather stream sink. The site
was enlarged in 1999 and the best way on may be down in the floor. Further work was carried out in the summer 2021 and on one session each in April and August 2022.
References: anon., 1980a (logbook); Corrin J et al, 1981b; Corrin J S and Smith P, 1981; anon., 1984 (logbook); anon., 1999c (logbook); Corrin Juan, 2000; anon., 2021c (summer logbook); anon., 2022b (Easter logbook); anon., 2022c (summer logbook)
Entrance picture : yes 1999 team 1 2
Underground picture(s): walk-in looking out digging 2m bar hammering : Floor April 2022
Video: draught, summer 2021 : water entering dig, April 2022
Detailed Survey : summer 2021
Line Survey :
On area survey :
Survex file : summer 2021