Updated 9th November 2003
A short squeeze down into a draughting entrance leads to the head of a pitch.
The belay is 2m down a tight rift and the pitch is 19m deep, landing on a
roomy ledge. A 3m climb down enters an enlargement that chokes in both
directions, the draught being lost.
References: anon., 1980a (logbook) (survey); Corrin J et al, 1981b (survey); Corrin J S and Smith P, 1981
Entrance picture :
Underground picture(s):
Detailed Survey : from 1980
Line Survey :
On area survey :
Survex file :