3736: shaft
Hornedo 30T 448760 4800837 (Datum: ETRS89. Accuracy code: G) Altitude 115m
Length 10m Depth 5m
Area position : Logbook search


Updated 21st May 2023

[Old grid reference: 30T 448758 4800862]
Entrance 1 is a 3.5m slide down over a block to a 6 x 2m chamber with a vertical mud bank at the northern end. This leads to a high window and day light from the second entrance. Nearby is the second hole, 3m diameter, with a 5m pitch landing in a roughly circular chamber of boulders. The only way out is down through a window to below entrance 1.

The site was given its correct grid reference in April 2023 when it was also found that the main hole was covered by boulders and bulldozed in.

Reference: anon., 2012d (summer logbook); anon., 2023b (Easter logbook)