2538: Cubillón, El
Moncobe 30T 446058 4796484 (Datum: ETRS89. Accuracy code: G) Altitude 235m
Length 1952m Depth 92m
Area position

Updated 1st, 2nd, 7th, 9th December 2011; 14th January 2012; 27th April, 27th September, 29th November 2012; 28th February, 26th April; 19th September 2013; 23rd May, 3rd December 2014; 5th July 2015 (Simon Cornhill); 18th October, 5th December 2015; 30th April, 16th July, 30th November 2016; 22nd May 2017; 1st July 2018

   "A tall opening that goes in 3m to a right then left turn to a slot in the floor with a boulder stopping the way on. There is a good draught." [Original description]

   With the encouraging draught, the boulder was removed and the slot enlarged in November 2011 opening the way into the only known system under this Moncobe hillside. Note that parking is very limited so try to coordinate vehicles.
   Some photographs, the current Survex 3d file and a survey are linked below along with a description of the cave. A day-by-day account of the exploration can be seen here.
   Up to November 2012, walks over the hillside above have failed to locate any other significant holes.
   Following a previously noticed cold draught descending the cliff face above the entrance, a traverse to the left in November 2015 gained access to a shaft (site 4274) about 25m above. This emerges in a rift 6m to the left of El Cubillón.

   The cave entrance lies in a depression at the bottom of a prominent limestone buttress. A walk into the high entrance rift soon rounds a bend and leads to a very short crawl to a tight descending rift which has been enlarged to give two possible ways down. A short ladder is useful at the top. The 5m rift opens into a small but high chamber with a draughting eyehole at the far end. The floor below the eyehole has been excavated to give a 2 - 3m shaft ending in a narrow slot. A slanting squeeze down leads to the top of a pitch. Alternatively a squeeze over the top leads to a small chamber and a tight connection to the pitch head from the other side. The first part of the pitch is another slanting squeeze to roomier territory. (At Easter 2014, tight sections were removed to allow easier access for a diver working alone. In October 2016, the first awkward take-off was enlarged).
   From here the 19m pitch gradually opens out into a roomy aven. The way on is up an easy 1.5m climb into a short tight passage ending in an impressive calcite aven. Leaving the passage involves a slightly awkward squeeze up and over a large flowstone boss to a 5m descent onto the floor of the aven. To the right an inlet needs further investigation. To the left a tall opening reveals that the floor is really a step in a larger aven. The next 19m pitch has a step about 8m down from where a ledge gives access to another way on. This has been climbed to a calcite choke possibly related to a tight inlet seen on the opposite side of the aven from the calcite boss. (In November 2012, at the start of the second rope pitch the gap between the calcite boss and the wall was widened but needs more work.) At the bottom a short high walking passage leads into an impressive breakdown chamber. (In October 2016, the aven just prior to the "p8" was bolted but safe progress stopped about 10m up due to boulders.)

    Any water from the pitch appears to stick tightly to the right hand wall and descend into an obvious stream passage. Climbing over boulders leads across the chamber to an ascending loose rubble heap leading to possible (very loose) ways on with a large aven above. The whole area appears to take a lot of water in wet weather. Down the far side of the rubble heap there are large clean-washed boulders with a hole down through which drops some 5-8m to what looks like a clean-washed floor.

   An easy climb down enters the aforementioned stream passage. After about 50m of easy walking the floor parts to reveal a lower level giving a 5m descent. On a 90 degree left hand bend a little way downstream from the 5m pitch, a crawl up an inlet for 30m reaches a high aven. This aven has been free climbed for around 30m using stals and natural threads as runners. Unfortunately nothing of interest could be found.
    From the 5m pitch, an impressively wide and high walking passage continues around several bends with some possible leads until the water course enters a low crawl over cobbles. This continues for some distance until becoming quite tight but still pushable. At the point it becomes tight, some 5m up on the left of the rift, there appears to be a larger passage emerging. (This low crawl is not yet surveyed). Before the crawl a slightly uphill walk to the left over mud banks leads after a couple of high chambers to an arch with an incredibly slippery floor of flowstone by a prominent stalactite (beware !!) and on into further easy walking. After about 50m the passage opens dramatically into an impressive, large, bare chamber with a single giant stalactite descending from the roof - Damocles Chamber. The passage now becomes larger and meanders past possible leads. At one point a jumble of boulders covered in decaying calcite with little visible means of support has to be climbed over. Eventually the passage divides at a knee deep pool, Watery Junction, but both branches remaining equally large and high. (A calcite slope between Watery Junction and the start of the stream passage was climbed in November 2012. A pretty grotto was reached but no access was gained to a possible roof tube above. This will need bolting up outside.)

   To the right the passage maintains its character. The floor now consists of totally horizontal soft calcite with thin rivulets. After about 100m the passage rises, becomes smaller and leads to a large chamber with ways on (not surveyed). To the left a slot around flowstone leads surprisingly into a classic active stream-way - narrow at water level but wider above. From the mud on roof stal it is clear that this passage has sumped at some time in the past. The running water does not equate with that met in the cave so far. After about 100m a significant inlet on the right leads to a junction at 25m; right soon gets smaller but with room for further exploration. To the left, the passage gets bigger and leads to a fairly steep slope passing a descending passage that probably connects back to the streamway.

   At the top of the mud slope is an important junction. Various routes on have been pushed for only a few metres but all continue. (This inlet has yet to be surveyed). About 150m after entering the stream passage there is a short climb down which leads after a further 10-15m to a pitch head, explored at the end of November 2011. A traverse out onto a rock arch permits a free hang of about 30m down into a deep lake - Stickle Tarn. It appears to sump although this has not been confirmed. Below water level the passage can be seen to continue in larger proportions. Across the top of the pitch there appears to be an inlet. (The survey ends just before the climb-down.)

   Back at Watery Junction the left hand branch requires a wade through the pool and a climb over muddy boulders. (Try to avoid the fine mud trumpets!). Almost immediately an impressive aven soars up into the darkness. This has been climbed to around 40m following what appears to be the main way. The very top is about 10m above the final stance, but soft calcite stopped progress. It looks very unpromising at the top with no draught. From a good stance at 20m a bolt traverse could be climbed over to another continuation of the aven, up a steep flowstone cascade.

After about 200m the easy walking passage (with leads and noticeable draught in November 2012) becomes a crawl to a small chamber and pool, Tilberthwaite Water. A passage with low air space can be seen continuing for some 15m.

[Above description by Phil Goodwin and Martin Barnicott]

Over Easter, 2012, a number of trips explored "side" passages and climbed avens, but the hoped-for high level remains elusive. Batches 12-01 - 12-06 were surveyed, adding 823m to the length to give a total of 1584m length. The centre lines for these batches can be seen on the Survex centre line. Descriptions of these batches should be integrated into the above description in due course. The top of the second pitch was also opened up.
There were no pushing trips over the summer, 2012.

At Easter, 2013, an aven was climbed (where?) and a bolt climb over the sump at Lake Tilberthwaite was climbed. From the start of the sump is an 8m bolt route up, then 4m of passage to a 2nd bolt climb of 4m, followed by 6m of rift passage then 4m of bolting along a traverse ending in a 6m pitch with a draughtless mud choke. The whole area is coated in very thick clinging mud. A 181m extension was also made in the west of the cave (junction name?) and this is shown on the centre line as batch 2538-13-02. A complete survey may appear in due course.

In the summer, 2013, at the same junction, Snail Aven was climbed and surveyed to where it pinched in. (Batch 13-03). From the same area, a route through a boulder was pushed to a climb up a waterfall (Batch 13-04). At the top there is a continuing upstream passage which is unsurveyed. The sump was inspected for a possible dive. Bolting was also started at the furthest south mud staircase with 5m of progress until the drill packed up.

At Easter, 2014 the sump was dived by Jim Lister who found it to be a metre deep with knee-deep mud and a non-starter. Across from the bottom of the pitch to the sump is a tight rift followed for 30m where it widened to 1m with deep water below. This was dived to a depth of 5m with the rift getting wider below. A return trip is planned.
The rift continues for another 30m to an inpenetrable inlet with with a small stream running in.
Bat Aven was climbed, ending in small rifts.

In November 2014, it was reported by Phil Goodwin that the end of "higher South Passage" was visited, "to aven bolted at Easter". The downward rift at the top is "too tight for most people" but "a determined thinny might get through". Rocks drop a considerable distance. "Slightly higher than the top, a large space can be seen through a 130mm calcite eye-hole - needs capping." At Easter 2016, stal was removed to reveal a substantial chamber beyond and snappers were used to open up the hole. On the second trip more work was needed, again using snappers. The exercise was repeated in October 2016.
Just above the bolt 8m up from the bottom of the aven, an opening on the left (looking up) descends through flowstone to a grotto and then links to the bottom of the pitch.
At that time, a collapse down an aven just before the last pitch in the entrance series was seen and found to have strong draught, appearing to be surface-related. The collapse was later linked to a surface collapse, site 4094.

In September 2015, more surface debris was noted. "Boulders have fallen down and silt is in danger of blocking the route through." The mud staircase needs steps cutting.

At Easter 2016, on the way out after snappering, the two-man team encountered flood conditions at the bottom pitch with the SRT rope in the main water. Eventually it was possible to fix the line at the base and to climb up the angled rope, with difficulty, but out of the water. It was then found possible to move a boulder just before the pitch edge to give the second caver a drier climb.

At Easter 2017, the rope on the second pitch was replaced and the rub-point removed. A water trace with optical brightening agent was also carried out. The OBA was placed in the stream near the sump, 23rd April 2017. A reasonable amount of rain fell which broke the very dry spell and OBA was detected at Fuente Aguanaz after 6 to 8 days. More details are shown here.

All the survey pieces were brought together in a drawn-up survey by Diane Arthurs and Simon Cornhill in July 2016.

Reference: anon., 2006d (summer logbook); anon., 2011e (autumn logbook); anon., 2011f (Christmas logbook); anon., 2012b (Easter logbook); anon., 2012e (autumn logbook); Corrin Juan, 2013a; anon., 2013b (Easter logbook); anon., 2013d (summer logbook); anon., 2014b (Easter logbook); anon., 2014d (autumn logbook); Papard Philip, Corrin Juan and Smith Peter, 2014; anon., 2015d (autumn logbook); anon., 2016b (Easter logbook); anon., 2016d (autumn logbook); anon., 2017b (Easter logbook)
Entrance pictures : yes : distant views
Underground pictures : yes : Easter 2012 : Easter 2013, Lake Tilberthwaite climb above sump
Video :
Detailed Survey : pdf file (November 2011) : projected section (line) pdf : Easter 2012 (in preparation) : Data - including info not yet on survey : annotated, Easter 2016 : July 2016
Line Survey : on aerial photo : on map (note differences between the two)
On area survey :
Survex file : yes (after summer 2013) (Amended magnetic declination December 2013 to align with Eur79 grid and coordinates altered to fit ETRS89 datum, April 2014.)
Passage direction rose diagram: 1/7/2018

X